Point-in-time archive of US power-project pipelines (EIA-860M planned generators, CAISO and SPP queues) with change log and SHA-256 provenance
-
Updated
Nov 13, 2026 - Python
Point-in-time archive of US power-project pipelines (EIA-860M planned generators, CAISO and SPP queues) with change log and SHA-256 provenance
Competing-risks survival analysis of 38,201 US interconnection-queue requests (LBNL): who gets built is predictable on day one (AUC 0.72, 3.7x top-decile lift) — who withdraws is a post-entry story.
Replication material for "Complements in the Queue: What Re-Studying Recovers, and What Only a Joint Interconnection Study Can" — a joint interconnection-allocation engine measuring what segregated generation/load study tracks cost on distribution feeders.
Public registry of large-load grid interconnection requests, with a conservative bound on residual compute (AI 2040 Plan A, Track 3).
ERCOT large-load interconnection queue tracker: history, zone scorecards, and Batch Zero explainer
ERCOT Site Clearance: draw a search area, score county-level queue pressure, peer timelines, and market stress
What the grid interconnection queue means for AI power: odds a project connects, wait distributions, the cost of delay, and ways around the line. Built on LBNL Queued Up data.
Search generator interconnection queue projects across US ISOs/RTOs - the public list of power projects waiting to connect to the grid.
MCP server for Kardashev Labs US grid data - LMP, carbon, load, queues, ERCOT large loads, RT−DA spread forecasts. No API key.
Is Berkeley Lab's median withdrawal time for the non-ISO West representative, when only 636 of 5,277 withdrawals report a date? The reporting subset differs sharply, but reweighting moves the median under three months and the direction is not identified. R analysis and paper.
Physics-grounded LV/MV/HV grid connection screening agent & MCP server: OpenDSS AC power flow, N-1 SCR, AS/NZS 4777.2 droop, and SHA-256 audit receipts.
Interactive D3 map of US grid interconnection: a hosting-capacity choropleth with the interconnection queue and ISO/RTO territories overlaid (synthetic demo data).